
When I left for work an hour later, our second floor looked like this:






When I came home Thursday evening, it looked like this:
This is the dust containment door, moved down to the bottom of the stairs:

Here are some hallway shots:



The inside of the library:

Here's the HVAC closet in the craft room:

Here's the small bathroom:

And the master bathroom:

Here's the server closet:

And the master bedroom:

Then, when I came home at noon on Friday, it looked like this:
The library:

The master bedroom:

The closets between the master bedroom and the master bathroom:

Views from the hallway:


Views from inside the library:


A shelving nook in the hallway, which we've carved out to get some dead space back from the HVAC closet:

The server closet:

And the HVAC closet:

To be continued: mudding starts on Monday!


No comments:
Post a Comment