The good news was that our contractors were able to make progress on a number of fronts while we worked the architect and tried not to panic.
They framed the closets between the master bedroom and the master bathroom:






Once the framing was done, the rough plumbing went into the master bathroom:



They also performed surgery in the foyer to add a soil stack for the master bathroom:


Meanwhile, in the small bathroom, they did some framing, moved a radiator, and worked on reinforcing the deeply maligned bathroom floor.