Monday, May 27, 2013

Windows and Floors

For about the last 4 weeks, we've been in an HVAC-inspired lull.

On the down side, this means we've been in an HVAC-inspired lull.

On the up side, it gave our contractor time to install 11 new windows, install sub-flooring in the bathrooms, install flooring in the closets, and replace / repair the sketchy floorboards in our hall.













No comments:

Post a Comment